Planning digital signage in new buildings
Building owners looking to include digital signage as part of the refurbishment process may see it as a method to boost branding by posting interesting and new content.
Digital signage is a category of signage that uses LED and LCD screens that display images, text or videos as content. These signs can be found inside and outside of establishments such as restaurants, shopping centres, office buildings, train and bus stations and so on.
If digital signage is going to be included, it should be considered during the initial design phase.
Installing LED and LCD screens in any part of a building can have an impact on the building’s physical features and electrical wiring. Mounts or platforms, electrical wiring and other cables, should be prepared beforehand for easier installation.
The location should also match its purpose. To maximise its effect, make sure there will be no glare, and people can see it easily when they walk in.
The fast pace of technology development means it may be necessary to make upgrades to digital signage. Hardware and software should be flexible and compatible with other systems. Owners should understand capabilities and limitations of their systems in terms of upgrades.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.